Mechanical/Electrical Permit Form - Oil tank removals require a site sketch - EV CHARGERS REQUIRE A NEW FORM
INSTRUCTIONS FOR SUBMISSION - ONLY PERMITS THAT DO NOT REQUIRE A FEE CAN BE SUBMITTED ELECTRONICALLY
CONTACT BUILDING@WILTONCT.ORG FOR THE PERMITTING PROCESS BASED UPON THE PROJECT. INCLUDE THE ADDRESS, DESCRIPTION OF WORK AND ESTIMATED COST.
NOTICE
EV CHARGER INSTALLATIONS REQUIRE THE FOLLOWING INFORMATION SHEET WITH ALL SUBMISSIONS.
KEY CHANGES IN MECHANICAL TO NOTE
REPLACEMENT OF GAS HEATING APPLIANCES TO GAS AND OIL HEATING APPLIANCES TO OIL REQUIRES A CERTFIED INSPECTION OF THE MASONRY CHIMNEY
CONVERTING FROM OIL TO GAS REQUIRES AN INSPECTION OF THE MASONRY CHIMNEY AND THE INSTALLATION OF A LINER.
A BLOCKED VENT SWITCH IS NOW REQUIRED FOR OIL FIRED APPLIANCES.
NEW ELECTRICAL REQUIREMENT MUST COMPLY WITH THE 2020 NEC
REQUIRES SURGE PROTECTIVE DEVICES ON NEW AND REPLACEMENT SERVICE EQUIPMENT FOR DWELLING UNITS
ALL NEW 1 AND 2 FAMILY DWELLING UNITS REQUIRE THE SERVICE DISCONNECT TO BE INSTALLED IN A READILY ACCESSIBLE OUTDOOR LOCATION.
YOU CAN PRINT THEN SIGN IF SUBMITTING IN PERSON OR FOLLOW INSTRUCTIONS FOR ELECTRONIC SUBMISSIONS. EMAIL COMPLETED FORM TO BUILDING@WILTONCT.ORG WITH A COPY OF THE LICENSE.
Fee Schedule Guide for projects Mechanical/Electrical Permits only
(not including site mechanical checklist costs)
EST. COST FEE EST. COST FEE
0 -1,000 $40.26 8,001-9,000 $92.34
1,001-2,000 $40.52 9,001-10,000 $102.60
2,001-3,000 $40.78 10,001-11,000 $112.86
3,001-4,000 $41.04 11,001-12,000 $123.12
4,001-5,000 $51.30 12,001-13,000 $133.38
5,001-6,000 $61.56 13,001-14,000 $143.64
6,001-7,000 $71.82 14,001-15,000 $153.90
7,001-8,000 $82.08 15,001-16,000 $164.16
**FOR ESTIMATED COSTS HIGHER THAN $16,000 PLEASE CALL THE OFFICE FOR FEE AMOUNT.